Introduction¶
As part of the Solana peer review process, Neodyme was engaged to do a review of pull requests to the SPL stake view program. In particular, the following pull requests have been reviewed:
Title | Link |
---|---|
Support stake redelegation | https://github.com/solana-labs/solana-program-library/pull/3856 |
Add “IncreaseAdditionalValidatorStake” instruction | https://github.com/solana-labs/solana-program-library/pull/3924 |
Add DecreaseAdditionalValidatorStake instruction | https://github.com/solana-labs/solana-program-library/pull/3925 |
All reported issues have been fixed as of January 27th, 2023
(commit hash b34102211f2a5ea6b83f3ee22f045fb115d87813
).
The program is still in active development, any changes past this point are out of scope for this report.
Project summary¶
The SPL stake pool program provides the ability for pooling together SOL to be staked by an off-chain agent running a Delegation Bot which redistributes the stakes across the network and tries to maximize censorship resistance and rewards.
SOL token holders can earn rewards and help secure the network by staking tokens to one or more validators. Rewards for staked tokens are based on the current inflation rate, total number of SOL staked on the network, and an individual validator’s uptime and commission (fee).
Stake pools are an alternative method of earning staking rewards. This on-chain program pools together SOL to be staked by a staker, allowing SOL holders to stake and earn rewards without managing stakes.
Contract expectations¶
Each user of the stake pool should be able to rely on the following two properties:
- Safety: It is always possible to withdraw the stake deposited. The user should receive stake proportional to their pool share.
- Fairness: Every user should receive the same relative rewards, so each user should only receive rewards proportional to their stake in the pool and not more.
Note that rewards are not guaranteed, as the manager of the stake pool can always decide to unstake the managed stake accounts. However, the “fairness” property ensures that assuming there is a well-behaved manager, all rewards will be distributed fairly among the users of the pool. The “safety” property ensures that if a user is no longer happy with the decisions of the manager, they can at any time decide to leave the pool and get back their share of stake.
Additionally, the manager should always receive the fees configured for possible user actions. There should be no way for any user to bypass the configured fees.
Methodology¶
Neodyme’s audit team performed a comprehensive examination of the changes included in the aforementioned pull requests for the SPL stake pool program. The audit team, which consists of security engineers with extensive experience in Solana smart contract security, reviewed and tested the code, paying special attention to the following:
- Ruling out common classes of Solana contract vulnerabilities, such as:
- Missing ownership checks
- Missing signer checks
- Signed invocation of unverified programs
- Solana account confusions
- Redeployment with cross-instance confusion
- Missing freeze authority checks
- Insufficient SPL account verification
- Missing rent exemption assertion
- Casting truncation
- Arithmetic over- or underflows
- Numerical precision errors
- Checking for unsafe design which might lead to common vulnerabilities being introduced in the future
- Checking for any other, as-of-yet unknown classes of vulnerabilities arising from the structure of the Solana blockchain
- Ensuring that the contract logic correctly implements the project specifications
- Examining the code in detail for contract-specific low-level vulnerabilities
- Ruling out denial of service attacks
- Ruling out economic attacks
- Checking for instructions that allow front-running or sandwiching attacks
- Checking for rug pull mechanisms or hidden backdoors
Scope¶
The audit encompassed the pull requests (patches) listed in “Introduction” (PR numbers 3856, 3924, 3925) and fixes for reported issues.
Peer review result: Overview¶
The audit team reported a total of 2 findings, of which (with decreasing impact)
- 0 were critical,
- 0 were high,
- 0 were medium,
- 0 were low, and
- 2 were informational.
Peer review result: Detailed findings¶
Informational: Redelegate
withdraws 1-2x rent to the reserve¶
Description¶
The Redelegate
instruction in the Stake Pool program - not to be confused with the Stake program’s Redelegate
instruction -
allows redelegating stake from one validator to another within the same epoch, without having to wait for the decreased
stake to fully deactivate before increasing the stake on the destination validator.
During Redelegate
, part of the stake decreased from the source validator is used as rent to fund two transient
accounts: The source transient account and the ephemeral account, which will be split or merged into the destination
transient account.
The source transient account’s rent will be withdrawn to the reserve after deactivation, which effectively reduces the amount of staked funds by 1x the rent exemption minimum.
The ephemeral account is split or merged into the destination transient account, depending on whether it already exists. If the destination transient account does not exist, then the ephemeral account’s rent will be reused as the destination transient account’s rent. This rent, however, will not be added to the destination validator stake but will instead be withdrawn to the reserve during an update after the eventual merge. If the destination transient account does exist, then the ephemeral account’s rent will be added to the validator’s stake.
In total, 1-2 times the rent exemption minimum will be deactivated and withdrawn to the reserve when using
Redelegation.
This does not cause lasting issues, as the staker can compensate with an additional Increase
instruction afterwards.
However, it might be confusing that a validator-to-validator redelegation changes the amount of staked funds, and
should at least be documented.
Resolution¶
This unexpected behaviour was acknowledged and documented in PR #3986. The relevant commit hash is 83cc57517b82e011fede442be017fffe54d92a44.
We think the proposed change is sufficient to address this issue.
Informational: Redelegate
implicitly checks the destination transient account’s state / Decreased funds can be added back in unexpectedly¶
Description¶
When merging an ephemeral account into an existing transient account, as is required for Redelegate
,
IncreaseAdditionalValidatorStake
, and DecreaseAdditionalValidatorStake
, the ephemeral account needs to have the
correct state for the merge to succeed.
For Redelegate
and IncreaseAdditionalValidatorStake
, the destination transient account is expected to be
Activating
.
For DecreaseAdditionalValidatorStake
, it is expected to be Deactivating
.
This check is not performed explicitly.
Instead, the Stake Pool program relies on the Merge
instruction of the Stake program to check the destination
transient account’s state.
This is documented for both IncreaseAdditionalValidatorStake
and DecreaseAdditionalValidatorStake
but not for
Redelegate
.
We recommended adding the relevant documentation for Redelegate
to avoid introducing a bug here in the future.
During the review of the solution proposed by the SPL Stake Program developers, we were informed by the developers of unexpected behaviour related to this finding that was reported by a 3rd-party auditor. We were asked to confirm this additional finding, which we did, and reviewed the proposed solution. This finding is described in the following.
When a validator has just been added in the current epoch, its canonical stake account will be Activating
and its
transient account will not exist.
By using the new IncreaseAdditionalValidatorStake
instruction, a transient account can be created that is also
Activating
.
When the staker now tries to decrease stake on the validator’s canonical stake account via
DecreaseAdditionalValidatorStake
, the instruction will succeed, but the funds will not be stopped from activating.
Instead, the funds will be split off from the canonical stake account into an ephemeral stake account and deactivated,
at which point the ephemeral account is Inactive
.
Afterwards, the program will attempt to merge the ephemeral account into the destination transient account.
This will
succeed and cause the funds in the ephemeral account to be added to the Activating
transient account, essentially
reactivating the just-deactivated funds.
Resolution¶
Our initial finding was addressed in PR #3986 by adding the suggested documentation, which we accepted.
The proposed solution for the finding reported by the 3rd-party auditor is included in
PR #3987.
This change introduced explicit checks on the destination transient account’s state for all three above-mentioned
instructions.
For DecreaseAdditionalValidatorStake
, the transient account is required to be Deactivating
or Inactive
.
We think this is a sufficient check.
For IncreaseAdditionalValidatorStake
and Redelegate
, the transient account is required to be Activating
or
Active
.
We have noted that it is not possible for a merge to succeed if the transient account is Active
, as merging
an Activating
ephemeral account into an Active
transient account is invalid and will be rejected by the Stake
program.
Furthermore, a transient account is only ever Active
if the stake pool is out-of-date, which prevents any of the three
instructions to run in the first place.
PR #4002 addresses our concerns by making both checks
more strict, narrowing the allowed states of the destination transient account to Deactivating
and Activating
respectively.
We think this change is sufficient.